purutyhub
  • home
  • Products
  • contact us
  • Whatsapp Us
  • Search
  • Cart (0)
  • Login

Search

  • home
  • Products
  • contact us
  • Whatsapp Us
  1. Product Installation SOP

Purity Hub – Product Installation SOP



At Purity Hub, we believe a product performs best only when it is installed right. To ensure a smooth, safe, and optimized installation experience, please follow the below standard operating procedure.


Step 1: Order Confirmation & WhatsApp Coordination

1. Once your order is confirmed, a Purity Hub team member will add you to a dedicated WhatsApp installation group.

2. This group will be used for all installation-related coordination, updates, and support.


Step 2: Site & Pipeline Image Sharing

On the WhatsApp group, you will be requested to share:


1. Clear images of the installation location.

2. Photos/videos of existing pipelines and plumbing layout.

3. This helps our technician:

> Understand site conditions in advance.

> Check if any special fittings or tools are required.

> Plan the best possible installation approach.


Step 3: Plumbing Material Checklist

Based on your site images, a Purity Hub team member will share a list of basic plumbing items that need to be arranged before installation day.
This ensures:


1. Zero delays.

2. A clean and efficient installation process.


Step 4: Product Dispatch & Bilty Sharing

Once the product is shipped, the bilty / transport details will be shared with you on the WhatsApp group for your reference and tracking.


Step 5: Network Cable Requirement (For SARTHI Integration)

For SARTHI-enabled installations:


1. Please arrange a CAT6 cable and a telephone wire from the water softener location to your WiFi modem.

2. The SARTHI control panel will be installed near the WiFi modem for stable connectivity.


For installations without Sarthi, only CAT6 cable is required and not a telephone wire.


Step 6: Electrical Requirement


1. A 5 Amp switch board is required near the SARTHI panel location to power the adapter.


Step 7: Pipeline Size Confirmation

Please share the exact inlet pipeline size through which your overhead tank fills.
Additionally, after order confirmation, a Purity Hub team member will personally video-call you at a mutually convenient time to:


1. Verify all site details.

2. Confirm pipeline sizes.

3. Ensure complete installation readiness.


Step 8: Installation Completion & Documentation

After successful installation:


1. The final invoice will be shared with you.

2. Selected installation photographs will be provided for your records.

3. This marks the official handover of your system.


Our Commitment

Purity Hub follows a structured installation process to ensure:


✔ Long-term performance

✔ System safety

✔ Hassle-free ownership


For any assistance, our team remains available throughout the process.

purityhublogo

Buy Water Softeners & Whole House Water Filtration Systems at Purity Hub. Connect directly with the team of Industry Experts & get access to customised products & easy services at your doorstep anywhere in India.

  • Add: Mansarovar Complex, GF-13, B-Block, Infront of Rani Kamlapati Railway Station, Bhopal, Madhya Pradesh - 462016
  • Email: purityhub.zoho@gmail.com
  • Phone Number:+91-62-62-100-101
Information
  • About Purity Hub
  • Terms of Service
  • Privacy Policy
  • Terms of Sale
  • Report Abuse & Infringement Policy
  • FAQ's
  • Warranty Coverage Status
  • Shipping Policy
  • Returns Policy
  • Refund and Cancellation Policy
  • Purity Hub Repair Advantage
  • Runxin Multiport Valves Catalogue
  • Sitemap
Connect
  • SarthiCare App (Android)
  • Facebook
  • Instagram
  • Twitter
  • Youtube
  • Blogs
  • Become a Reseller
  • Become An Affiliate
  • Ain Shams University, Egypt - Research about Magnetic Water Softeners
  • Product Installation SOP

Copyright © Purity Hub all rights reserved. Developed by Atoms India

Buy/Service Support

Raise Ticket

×